Loading
Page views this IP this session = 1 of 10 unsubscribed pagesAfton Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Afton Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Afton Wind Farm (Wind , Active) Location in the UK : Scotland, new cumnock Type of installation: Wind on/offshore: on Turbines :25 Capacity : 74 MW Approx Date of 1st power generation: February 2018
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Proposals involve developing a site on land which forms part of the Afton Reservoir catchment area, approximately 8km south of New Cumnock, East Ayrshire. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register New Cumnock adjacent to Afton reservoir
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Afton Wind Farm 50 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4262 / N00302W
District:
|
Applicant: |
InfraRed Capital Partners/ E.on
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
25 |
Turbine Capacity: |
2 |
Height of Turbines: |
120 |
Calculated capacity: |
50 |
Site Address: |
To the south west of New Cumnock adjacent to Afton reservoir
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
262100 / 262100
|
Development Status: |
Operational
|
Application Submitted: |
11/3/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/16/2016
|
|
|
Generator Live |
2/15/2018
|
This Record Last Updated: |
10/2/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 100 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 21 m/s (46.977 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/2/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Red Rock Power AFTON AFTON Wind Farm is an operational 50 MW onshore wind development in East Ayrshire, Scotland. The wind farm will power up to 35,000 homes each year and is expected to generate 3.5 million MWh of electricity in its lifetime.
Red Rock on the money at AFTON Red Rock Power has secured £80m (€91m) from NatWest bank for the 50MW AFTON wind farm in East Ayrshire, Scotland.
InfraRed buys AFTON Wind Farm from E.ON AFTON Wind Farm, which was developed by E.ON Climate & Renewables, will be a 25 turbine, 50MW onshore wind farm located on land adjacent to AFTON Reservoir near New Cumnock.
Wind farm worker dies after being stranded by heavy snow The 74-year-old security guard and a 42-year-old colleague were working on Sunday at AFTON Wind Farm, which is under construction near New Cumnock in East Ayrshire
ShAFTON The ShAFTON turbine is located on the former ShAFTON Two-Gates Coking site which lies between the villages of Grimethorpe and Cudworth.
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|